Tessaro Collective Tessaro Collective
Industries · Quick service restaurants

One consistent program across every location.

Rush periods, deliveries, and kitchen heat push the walk-in and the rooftop unit harder than almost any other building type. Multi-unit operators need a fix that is the same at every store. We design it once, prove it at a pilot site, and roll it out.

Where the money goes

Where quick service restaurants lose money

Rush periods and door openings load the walk-in and the rooftop unit.

Energy

Refrigeration that never rests

Every door opening loads heat into the room, and the compressor carries all of it in real time. That drives runtime, wear, and peak demand.

How we fix it →
Cold storage technology in partnership withGreentek
Energy

HVAC working harder than it needs to

Fans and compressors often run longer and harder than the space requires, and compressor oil gradually coats coil tubes, cutting heat transfer a little more every year.

How we fix it →
Indoor air

Odors, mold, and allergens

Odors, mold, and allergens feed on organic matter that builds up on surfaces and inside ductwork. Masking products don’t remove it.

How we fix it →
What we typically design

A coordinated fix, sized to each property.

  • Cold storage thermal energy
  • HVAC optimization
  • Kitchen odor control
Documented

One consistent program across every location

See all results →
Documented results

Evidence from similar properties

Client names are kept confidential.

Energy

Cold storage warehouse

Measurement and verification study

29%Lower peak refrigeration demand
Approach
Thermal energy storage
Hold time, refrigeration off
15 hours in one study

Rooms held temperature far longer during interruptions.

Energy

Independent laboratory testing

HVAC controls · treated unit vs. control unit

21%Average reduction in HVAC energy
48-hour steady state
−15%
96-hour programmed
−27%
Indoor temperature
Within 1.4°F of control

Comfort maintained while energy use dropped.

How we work

From your bills to a verified result

  1. Listen

    Your goals, sites, operating hours, and the complaints you hear most.

  2. Diagnose

    12 months of bills, a walk-through, and equipment data.

  3. Design the collective

    The right combination for each site, with savings and payback.

  4. Implement

    Certified technicians, scheduled around your operations.

  5. Verify

    Before-and-after comparison against your bills.

Other industries

Let’s look at your portfolio.