Cold storage warehouse
Measurement and verification study
- Approach
- Thermal energy storage
- Hold time, refrigeration off
- 15 hours in one study
Rooms held temperature far longer during interruptions.
Rush periods, deliveries, and kitchen heat push the walk-in and the rooftop unit harder than almost any other building type. Multi-unit operators need a fix that is the same at every store. We design it once, prove it at a pilot site, and roll it out.
Rush periods and door openings load the walk-in and the rooftop unit.
Every door opening loads heat into the room, and the compressor carries all of it in real time. That drives runtime, wear, and peak demand.
How we fix it →Fans and compressors often run longer and harder than the space requires, and compressor oil gradually coats coil tubes, cutting heat transfer a little more every year.
How we fix it →Odors, mold, and allergens feed on organic matter that builds up on surfaces and inside ductwork. Masking products don’t remove it.
How we fix it →Client names are kept confidential.
Measurement and verification study
Rooms held temperature far longer during interruptions.
HVAC controls · treated unit vs. control unit
Comfort maintained while energy use dropped.
Your goals, sites, operating hours, and the complaints you hear most.
12 months of bills, a walk-through, and equipment data.
The right combination for each site, with savings and payback.
Certified technicians, scheduled around your operations.
Before-and-after comparison against your bills.