Cold storage warehouse
Measurement and verification study
- Approach
- Thermal energy storage
- Hold time, refrigeration off
- 15 hours in one study
Rooms held temperature far longer during interruptions.
Cold storage warehouses carry large refrigeration loads, expensive peak demand charges, and inventory that cannot tolerate an interruption. We design a way to shift part of the cooling load and keep rooms at temperature longer when refrigeration stops.
Large refrigeration loads with expensive peak demand and inventory at risk.
Every door opening loads heat into the room, and the compressor carries all of it in real time. That drives runtime, wear, and peak demand.
How we fix it →Modern equipment creates harmonics and phase imbalance. That extra current turns into heat, wear, and wasted kWh at every panel.
How we fix it →Client names are kept confidential.
Measurement and verification study
Rooms held temperature far longer during interruptions.
Your goals, sites, operating hours, and the complaints you hear most.
12 months of bills, a walk-through, and equipment data.
The right combination for each site, with savings and payback.
Certified technicians, scheduled around your operations.
Before-and-after comparison against your bills.