Cold storage warehouse
Measurement and verification study
- Approach
- Thermal energy storage
- Hold time, refrigeration off
- 15 hours in one study
Rooms held temperature far longer during interruptions.
Walk-ins, beer caves, and reach-in coolers run around the clock and carry most of a convenience store’s electric bill. Constant door openings make it worse. We design a repeatable program that can roll out store by store across a portfolio.
Walk-ins, beer caves, and beverage coolers run 24 hours a day.
Every door opening loads heat into the room, and the compressor carries all of it in real time. That drives runtime, wear, and peak demand.
How we fix it →Modern equipment creates harmonics and phase imbalance. That extra current turns into heat, wear, and wasted kWh at every panel.
How we fix it →Fans and compressors often run longer and harder than the space requires, and compressor oil gradually coats coil tubes, cutting heat transfer a little more every year.
How we fix it →Client names are kept confidential.
Measurement and verification study
Rooms held temperature far longer during interruptions.
Your goals, sites, operating hours, and the complaints you hear most.
12 months of bills, a walk-through, and equipment data.
The right combination for each site, with savings and payback.
Certified technicians, scheduled around your operations.
Before-and-after comparison against your bills.