Tessaro Collective Tessaro Collective
Results

The evidence behind every figure.

Documented outcomes from occupied buildings and independent testing. Client names are kept confidential.

Water

Waterfront hotel

Upper Midwest · 200+ guest rooms, spa, restaurants

34%Less water used
Annual savings
About $38,000
Gallons saved per year
3.2 million
Return on investment
8 months

No pressure reduction, no service interruptions, no change to the guest experience.

Water

Student housing community

Southeast · multi-story residential

28.5%Less water used
Annual savings
About $36,000
Installation time
5 hours
Return on investment
8 months

Same pressure on the top floor before and after; savings held as occupancy rose.

Energy

University athletic center

Mid-Atlantic · gyms, pool, and offices

12.5%Lower kWh
Study length
14 months
Method
Measured against control buildings
Approach
Power quality filtering

Control buildings saw consumption rise over the same period.

Energy

Independent laboratory testing

HVAC controls · treated unit vs. control unit

21%Average reduction in HVAC energy
48-hour steady state
−15%
96-hour programmed
−27%
Indoor temperature
Within 1.4°F of control

Comfort maintained while energy use dropped.

Energy

Cold storage warehouse

Measurement and verification study

29%Lower peak refrigeration demand
Approach
Thermal energy storage
Hold time, refrigeration off
15 hours in one study

Rooms held temperature far longer during interruptions.

Indoor air

24-facility study

Healthcare, education, food processing, and offices

90%+Reported odor elimination after 30 days
Duration
12 weeks
Applications
2 per week
Biofilm biomass
76.3% reduction

Results consistent across facility types.

Indoor air

Rural hospital and nursing home

Southeast · two care facilities

1 weekUntil staff reported fresher air
Delivery
Through existing HVAC
Applications
2 per week

Persistent odors and heavy, stale air resolved; ductwork easier to keep clean.

Indoor air

Multi-level government facility

Southeast · large office building

AllSigns of mold and dust mites eliminated
Delivery
Misting units on the HVAC system
Support
1 year of ongoing treatment
Verification
Post-treatment testing

Non-intrusive treatment while the building stayed occupied.

Indoor air

Flood-damaged home

Gulf Coast · residential

~6 weeksTo resolve flood odors and mold concerns
Flood depth
About 4½ feet
Delivery
Continuous, through HVAC

No foul smell and no continued mold concerns observed.

Results are from case studies and independent test reports. Individual results vary with property, equipment, operations, and utility rates.

What could your property save? Let’s look at your bills.